Wet Pond / Water Quality SizingPermanent Pool + Forebay
Parameter
Formula
Result
Notes
Freeboard CheckPer Selected Standard
Component
Required (ft)
Provided (ft)
Status
Engineering Calculations — Step by StepREF: ASCE / NRCS TR-55
Project Information
PondCalc · Detention Pond Sizing Estimator
PRELIMINARY NOT FOR CONSTRUCTION
⚡
Quick Pond Estimate
No IDF curves, no C values needed. Just your site area, land cover breakdown, and state — Tc and intensity are automatically scaled to your drainage area size using TR-55 guidelines.
📐 Site Information
Select a state to see regional rainfall assumptions.
🌾 Land Cover — PRE-DEVELOPMENT
Existing conditions before your project. Must total 100%.
Grass / Lawn / Pasture70%
Bare Earth / Disturbed20%
Impervious (roof, paving)10%
Total100%
Pre-Dev Composite C:—
🏗 Land Cover — POST-DEVELOPMENT
Proposed / built-out conditions after your project. Must total 100%.
Regional rainfall from conservative NOAA Atlas 14 representative values for selected state grouping
Design storm:
Pre- and post-development composite C values calculated from user-entered land cover percentages
Time of concentration (Tc) and rainfall intensity automatically scaled to drainage area size per TR-55 / typical municipal standards — larger sites use longer Tc and lower intensity
Pond geometry estimated at 3:1 side slopes, 5 ft active depth, 1 ft freeboard
A full site-specific analysis with IDF curves, actual Tc, and surveyed geometry is required for design